July 30, 2008

Singapore Visiting Workshop

aa_sng_11.jpg

Larry presenting the growth of their building

Singapore Visiting Workshop

aa_sng_10.jpg

Ivan explaining his group’s proposal for the extension of the UOB complex

Singapore Visiting Workshop

aa_sng_9.jpg

Models

Singapore Visiting Workshop

aa_sng_7.jpg

The public “garden” on the 26th floor

Singapore Visiting Workshop

aa_sng_6.jpg

Up to the 26th floor

Singapore Visiting Workshop

aa_sng_5.jpg

Peng Beng giving a site tour of the pinnacle@Duxton currently under construction to
the workshop

July 25, 2008

Crossings at SPANS exhibition

val-picture-1.jpg
Last nights SPANS exhibition opening at the Building Centre featuring the CROSSINGS project part of a group show about Viaducts, Bridges and Walkways. The show runs from 24 July â?? 20 September

Crossings at SPANS exhibition

val-picture-2.jpg
Site model 1:50 – concept and design by Claude Ballini

Crossings at SPANS exhibition

val-picture-4.jpg
Yuko and Naoki

Crossings at SPANS exhibition

val-picture-5.jpg
Crossings is the smallest bridge with the shortest span 19m â?? project Nr. 1

Crossings at SPANS exhibition

val-picture-6.jpg
Detail of STL model made out of ZP131 and Cyber bond 5005.

Crossing at SPANS exhibition

val-picture-7.jpg
Under belly of the model â?? 5mm steel rode holding 4mm of landscape tiles.

July 24, 2008

Maeda Workshop

finished.jpg

Installation completed.

Maeda Workshop

shin.jpg

The Japanese electrician making some final adjustments.

Maeda Workshop @ AA Dining Room

team.jpg

Photo time.

Maeda Workshop

maedathurs1.jpg

Installation day 3.

July 23, 2008

Maeda Workshop

pieceswaiting.jpg

Pieces sealed and waiting.

Summer School Unit 3

sumsc3.jpg

The ‘Urban Scientists’.

Summer School Unit 3

sumschunit3.jpg

Making blank canvas jump suits.

They will go out and add to them according to the reactions they get.

Projects Review

photo2.jpg

.